At Rajpuriya Interiors, we craft spaces that reflect personality, functionality, and elegance. Based on the belief that interiors shape the quality of life, our designs blend innovation with comfort—tailored to suit your lifestyle.
Our team of visionary designers brings a wealth of experience, passion, and detail-driven focus to each project, whether it’s a cozy residence or a dynamic commercial space.
Empowering our users to bring their unique design visions to life with creativity and precision.
Interior Designed
Happy Customers
Professional Architects
What to do: Define scope (rooms, what’s staying/going), functions, target style, must-have items, budget range and target completion date. Deliverable: Short written brief. Time: 1–3 days.
What to do: Measure, photograph, note structural elements, services (electrical, plumbing, HVAC), levels, and access for deliveries. Check for asbestos/rotten timber if old building. Deliverable: Measured drawing, photo set, services map. Time: 1–3 days.
What to do: Verify building rules, obtain permits if needed, confirm electrical/plumbing capacity and meter access, check fire/egress requirements. Deliverable: List of required permits/approvals and responsibilities. Time: variable (days–weeks).
What to do: Produce a layout option(s) showing furniture, clearances, and zoning; pick rough materials and lighting concept. Deliverable: Schematic plan(s), mood board or concept sheet. Time: 3–7 days.
What to do: Lock configuration, finishes, lighting, major fixtures, and any bespoke joinery. Review with client and get sign-off. Deliverable: Final layouts, finish schedule, and cost allowance list. Time: 1–2 weeks.
What to do: Produce working drawings (plans, elevations, joinery details), electrical & lighting plans, plumbing and any structural details. Create a spec sheet for each item. Deliverable: Construction drawings, schedules, and spec pack for tendering. Time: 1–3 weeks (depending on complexity).
What to do: Send drawings/specs to 2–3 contractors, compare quotes, check references, agree terms and timeline. Set a payment schedule. Deliverable: Signed contract with contractor and agreed cost/time. Time: 1–2 weeks.
What to do: Order long-lead items (kitchen, wardrobes, lighting, custom joinery), track deliveries, and schedule trades around arrivals. Deliverable: Procurement list with lead times and delivery schedule. Time: run concurrently with contracting; ordering 4–10+ weeks before install for custom items.
What to do: Protect retained elements, disconnect services, remove finishes/fixtures as needed, prepare space for new work. Deliverable: Cleared, safe site ready for build. Time: days–2 weeks.
What to do: Protect retained elements, disconnect services, remove finishes/fixtures as needed, prepare space for new work. Deliverable: Cleared, safe site ready for build. Time: days–2 weeks.
What to do: Walkthrough with client, hand over manuals/warranties, as-built drawings, and maintenance notes. Get final payments. Deliverable: Handover pack and client sign-off. Time: 1–3 days.
What to do: Visit after 4–12 weeks to review performance and comfort; adjust minor items. Deliverable: Post-occupancy report and any tweaks.
From concept to completion, we keep communication clear and timelines realistic so you can enjoy the process.
We work with trusted suppliers and skilled craftsmen, ensuring durability, fine finishing.
From layout planning and color selection to furniture sourcing and final styling.